Ducting, piping & tubing work

We have a team of experienced engineers to take off material from the piping drawings before fabrication of pipe spools commences. Gaskets’ specifications, valve types, fittings are carefully identified to ensure accurate fabrication. X-ray inspection and hydraulic tests are carried out before delivery to site for installation.

Among the major projects are:

1. Demineralization plant galvanized and stainless steel piping works, and tubing works for GPP3&4 petroleum plant.

2. Carbon steel piping works for tank farms.

3. Hydraulic piping works for limekiln discharge traps.

4. Coal duct feeding rubber hoses for limekiln.

5. Carbon steel coal duct feeding for limekiln.

6. Cement lined water piping works.

7. Deducting piping works for duct control system.

8. Hot gas ducting for heat recovery in cement plant.

 
 
 
 
 
 
 
 
 
 
 